D-Series Dual-Chuck High-Speed Zero-Scrap Tube Laser Cutting Machine

D-Series Dual-Chuck High-Speed Zero-Scrap Tube Laser Cutting Machine The core feature of this equipment lies in the coordinated operation of its front and rear chucks. The rear chuck can move beyond the front chuck, enabling effortless processing of long profiles and achieving ultra-short tail waste cutting. This mechanical design effectively reduces material loss and significantly improves material utilization rates. The side-mounted rear chuck structure facilitates easier tube loading, ensuring smooth and efficient production workflows.

Horizontal Structure for Enhanced Stability & Precision

The horizontal design ensures smooth operation and high cutting accuracy complemented by intelligent tube cutting software for fully automated and intelligent cutting processes

Horizontal Structure for Enhanced Stability & Precision

Side-Mounted Rear Chuck for Efficient Loading

The side-hung rear chuck simplifies tube loading improving operational efficiency and productivity

Side-Mounted Rear Chuck for Efficient Loading

Dual-Chuck Clamping for Ultra-Short Tail Material

The front chuck handles side cutting while dual-chuck clamping during final cutting ensures precision and achieves extremely short tail material minimizing waste

Dual-Chuck Clamping for Ultra-Short Tail Material

Large-Profile Machining Capability

Unlike traditional fixed front chuck designs this model allows the rear chuck to advance beyond the front chuck enabling ultra-short tail material cutting even for large channels and steel beams with extra clamping support This significantly reduces material costs and boosts customer profitability

Large-Profile Machining Capability

Automatic Unloading & Scrap Collection System

Equipped with an automatic unloading and remnant collection system supporting high-volume batch production with minimal manual intervention

Automatic Unloading & Scrap Collection System

Flexible Feeding Options

Optional fully automatic or semi-automatic feeding racks are available to adapt to diverse production needs and workflow preferences

Flexible Feeding Options
ModelCutting rangeLaser output powerXaxis travelY axis travelZ axis travelX/Y axis positioning accuracyMaximum acceleration
DPE-D6012Length 6,5 meters, round tube diameter 10-120MM,load bearing 20KG/meter, full stroke chuck1500w,2000w,3000w6200mm500mm200mm0.02mm/m1.0G
DPE-D6016Length 6.5 meters, round tube diameter 20-160MM,load bearing 20KG/meter, full-stroke chuck1500w,2000w,3000w6200mm500mm200mm0.02mm/m1.0G
DPE-D6024Length 6,5 meters, round tube diameter 20-220MM,load bearing 25KG/meter, full stroke chuck1500w,2000w,3000w6200mm500mm200mm0.02mm/m1.0G

A:Samples are available with a cost payment (deductible from bulk orders).
Full test reports provided, including material metallurgical analysis, cutting surface roughness, and laser spot diameter measurements.

A:1. Appearance Customization
Laser engraving on equipment shells (Pantone color matching and vector LOGO etching supported).
2. Functional Customization
Custom process modules developed for specific industry needs (material type, thickness range, and processing speed requirements must be provided).
3. System Customization
Multi-language UI (German, Spanish, etc.) and PLC reprogramming available.

A: Nantong Base (Jiangsu): 90-acre facility specializing in high-power laser cutters (6kW–30kW) and automated production line integration.
Dongguan Base (Guangdong): 40,000㎡ modern factory focused on export-grade precision laser equipment (virtual factory tours available within 72 hours, including CNC machining centers and laser optics labs).

A:Standard Models Monthly Output:
Laser cutters: 80+ units (expandable by 30% with 25-day lead time).
Laser welders: 120+ units (expandable by 50% during peak seasons with 7-day notice).
Historical Data: Over 25,000 units delivered in 13 years, with an annual production capacity of 20,000+ units.

A:Standard Models: 15–20 working days (includes optical calibration and test cutting reports).
Custom Orders: 25–30 days (30% faster than industry average).
Global Logistics: 25-day sea freight (includes destination customs clearance and on-site installation support).